System Capacity Plans
Planning Documents to Address SacSewer System Capacity Needs
System Capacity Plan
In 2020, the System Capacity Plan was updated to be a comprehensive plan that addresses existing and buildout sewer capacity needs based on SacSewer’s current sewer system conditions.
- Appendix A Cover Page
- BR Bond Sheldon
- BR Calvine
- BR East Rancho
- BR Elder Creek
- BR Florin
- BR Gerber
- BR Jackson
- BR Mather East
- CE Elk Grove-Florin
- DR Rio Linda SE
- DR UN Rio Linda East
- FE Folsom
- LA East Franklin
- LA Elk Grove SOI
- LA Elk Grove
- LA Laguna Ridge
- NE CE Gravel West
- NN Metro Air
- UN Elverta
- UN Orangevale
- UN Rio Linda SW
- UN Rio Linda West
Interceptor Sequencing Study
The Interceptor Sequencing Study is for the largest pipes in our system, called interceptors. The study provides a high level evaluation of interceptor alternatives and identifies interceptor alignment corridors as well as anticipated capacity needs and interceptor pipe sizes.
- Appendix 1 – TM 01 Land Use Planning and Growth Criteria
- Appendix 02 – TM 02 Design and Performance Storms and Approach for Modeling Spatial Rainfall Variation
- Appendix 03 – TM 03 Flow Generation Criteria
- Appendix 4 – TM 04 Facility Criteria
- Appendix 5 – TM 05 Unit Costs for Interceptor Pipe
- Appendix 6 – TM 06 Life Cycle Cost Criteria For Interceptor Conveyance Facilities
- Appendix 7 – TM 07 ESD Absorption Rate Analysis
- Appendix 8 – TM 08 Alternatives Risk Analysis
- Appendix 9 – TM 09 Unit Costs for Centralized, Scalping, and Satellite Wastewater Treatment Plants
- Appendix 10 – TM 10 Life Cycle Cost for Centralized, Scalping, and Satellite Facilities
- Appendix 11 – TM 11 Interceptor Conveyance Alternatives
- Appendix 12 – TM 12 Treatment Technologies Used for Centralized, Scalping, and Satellite Alternatives
- Appendix 13 – TM 13 Hydraulic Model Evaluation
- Appendix 14 – TM 14 Model Loads for Non-SASD Contributing Agency
- Appendix 15 – TM 15 Decentralized and Centralized Treatment Alternatives
- Appendix 16 – TM 16 Growth Projections for Long Range Funding
- Appendix 17 – TM 17 Folsom SOI Flow Generation
- Appendix 18 – TM 18 Proposed Future Interceptors Plans and Profiles